The goal of this bathroom remodel was to freshen up the old bathroom in a style that would complement the period of the house.
Removing the original tile and plaster required stripping this bathroom down to the studs. The galvanized water supply lines were replaced with copper supply lines. New drywall was then installed on the ceiling and walls. The tiles selected for the floor and walls were chosen to reflect the period of the home.
Please scroll down to view photos of the completed project and some "before" shots of the original bathroom.